Successful Projects

RIOBOBO Hydraulic Power Plant in Colombia
CJA475-W-105/2×10.5
Water head: 306 m Water flow: 0.623 m3/s

Hydraulic turbine generator set
Capacity: 40KW to 80000 kW

Highlander RSE1 Power Plant in Britain
XJA-W-42/1×10 SFW100-8/590
Water head: 361.8 m Water flow: 0.24 m3/s

Tuztasi Power Plant in Turkey
HLA616-WJ-80 SFW1113-10/1430
HLA551c-WJ-48SFW432-6/990
Water head: 33.62 m Water flow: 3.97/1.55 m3/s

QADIRABAD , Pakistan
CJA475-W-100/2×10 SFW1500-10/1430
Water head: 206 m Water flow: 1.8 m3/s

Discover FORWARD projects,

Get in touch with us

7 + 11 =

Forward hydro
Design and production of generating equipment
for 5KW-50MW hydro power project.

Facility1: Shashi Zhanggong Distrcit,
     Ganzhou, Jiangxi, China
Facility2: Xiaogan District, Changzhou,
     Jiangsu, China
Cell: +86 139 2240 9874
E-mail: sales@smallhydroturbine.com