Successful Projects

Shada, Pakistan
HLA696-WJ-68 SFW1000-8/1180
Water head: 47.5 m Water flow: 2.62 m3/s

Verbe-Selce II HPP in Albania
CJA475-W-115/2×8 SFW3000-8/1730
Water head: 379.7 m Water flow: 0.685 m3/s

Tubular turbine generator set
Water head: 2 m to 25 m Capacity:
160 KW to 5000 KW

VIETNAM
HL100-WJ-50 SFW200-6/740
Water head: 55.7 m Water flow: 0.5 m3/s

VIETNAMHLA551c-LJ-155 、SF2720-24/3250
HLA551c-LJ-155、SF2560-24/3250
Water head: 22 m